In week two, we were given the task of creating a new module. First, we hauled a ton (literally felt like a ton) of 50 lbs. of soil bags onto the elevator from the ground floor. It was a long and arduous process and it took a while to figure out a way to methodically do so without over-weighing the elevator. We eventually figured it out.

Once all of the bags where on the roof, we laid out each empty module quartile and aligned them with the existing modules. Then, we filled them up accordingly. The base layer with the fabric followed by the soil and topped with the gravel. This process helps with the movement of water through each layer and the ability to retain at the base.

 

Photo: Soil and gravel installation to each module quartile.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s